Technical Requirements he manufacturing method of FRP pressusre vessel ( membrane housing) is in accordance with the standard JC692-1998 Design for the pressure of the FRP Pressure vessel ( membrane housing) is 150, 300, 450, 600, 800, 1000PSI, and the working temperature is 7 degree Celsus - 49 degree Celsus The permeability test of the membrane housing with a way of using water pressure. The test pressure is 1.5 times of the standard pressure.
he manufacturing method of FRP pressusre vessel ( membrane housing) is in accordance with the standard JC692-1998
Design for the pressure of the FRP Pressure vessel ( membrane housing) is 150, 300, 450, 600, 800, 1000PSI, and the working temperature is 7 degree Celsus - 49 degree Celsus
The permeability test of the membrane housing with a way of using water pressure. The test pressure is 1.5 times of the standard pressure